Data reduction & analysis software for LSS instruments SANS data reduction: GRASP Mantid (with DrILL table) Analysis of SANS data: SasView: https://www.sasview.org/ and SASfit: https://github.com/SASf
Recherche
Recherche de -820,638.26.
573 résultats ont été trouvés en 3 millisecondes.
Affiche les résultats de 451 à 460 sur 573.
Pages
Pertinence: 100%
Pages
DOIs for data The ILL, with the support of the European Commission, is one of the first institutes in Europe to have developed and implemented a policy for the management of experimental data. As earl
Pertinence: 100%
Pages
Scientific member country since 2009 National representative at the ILL Danish agency for science, technology and innovation Scientific Member Representative: Nicolai NARVESTAD | The Danish Agency for
Pertinence: 100%
Pages
Back to main page Top T he DEC10 KI1070 (1973-82) in the "corridor" in ILL7 The DEC10 or PDP10 KI1070 (1973-82) in the "corridor" in ILL7 with CPU and DECtapes on the right, 5 magnetic tape drives and
Pertinence: 100%
Pages
D22 Manual This manual describes the characteristics and the use of D22, the latest small-angle neutron scattering instrument at the ILL. An up-to-date version of this help file is available on the in
Pertinence: 100%
Pages
206OXHV26 (7T) Stray Magnetic Field and Siting Issues on D17 We present below the magnetic forces measured on D17 with the 7T vertical field magnet 206OXHV26 and the new spin analyser installed in the
Pertinence: 100%
Pages
(html - 2.07 Ki) How does the D11 SANS instrument work? D11 is the archetype of a long, pinhole geometry instrument for small-angle neutron scattering (SANS), designed for the study of large scale str
Pertinence: 100%
Pages
Home AF Numicom version Numicom animation revisited Principle Animation SANS principle Rheology Polymers (Tires) Isotopic substitution SANS patterns D11 principle v2 (html - 1.98 Ki) Pierre Corade, Fr
Pertinence: 100%
Pages
L'ILL a conclu ses cycles de fonctionnement 2025 à la fin du mois d'octobre. Au total, plus de 1800 scientifiques sont venus à ILL pour effectuer près de 1400 expériences. Le réacteur à haut flux redé
Pertinence: 100%
Pages
Les démarrages et arrêts on lieu à 8h30, à l'exception des lundis à 11h30. 2026 Cycle n°199 - 48 jours 24/03 - 11/05/2026 56 MW Cycle n°200 - 56 jours 08/06 - 03/08/2026 47.9 MW Cycle n°201 - 58 jours
Pertinence: 100%
