Page 160 - Neutrons for Sciences and Society
P. 160
Neutrons for Science
was intended to enter) routine operation. We see that very few instruments were completely ready when the reactor was fully operational with the cold and hot sources in May 1972. Most were installed in position around the reactor but in a test phase.
Table 6.1 Operational instruments in the activity report of 1972
IN1
Triple-axis
Hot source
Routine operations
February 73
IN2
Triple-axis
Thermal beamtube
Routine operations
October 72
IN3
Triple-axis
Thermal guide
Construction finished - on test
April 73
IN4
Rotating crystal
Thermal beamtube
Construction finished - on test
April 73
IN5
Multi-chopper
Cold guide
Installation nearly finished - on test
April 73
IN6
Triple-axis
Hot source
Installation foreseen in May 1973
April 74
IN7
Statistical chopper
Thermal guide
Installation finished; on test
April 73
IN8
Triple-axis
Thermal guide
Awaiting parts
April 73
IN9
Polarised proton target
Cold guide
On test
Autumn 73
IN10
Backscattering
Cold guide
In progress
Begining 73
D1A
2-axis diffractometer
Thermal guide
Installation finished
May 73
D1B
2-axis diffractometer
Thermal guide
Installation finished
May 73
D2
2-axis diffractometer
Thermal beamtube
Routine operations
August 72
D4
2-axis diffractometer
Hot source
Routine operations
February 73