Page 107 - ILL Annual Report 2019
P. 107

 REACTOR OPERATION
1 0 2 - 10 3
 THE KEY REACTOR COMPONENTS (KRC) PROGRAMME
The aim of the KRC programme is to ensure the upgrade and maintenance of the reactor’s most important components, thus guaranteeing the reliability of reactor operations for the future. The main components concerned are the cold neutron sources, the fire protection equipment and the physical protection equipment.
RADIOACTIVE WASTE AND EFFLUENTS
The ILL’s activities in 2019 generated waste and effluents in respect of the regulatory limits applicable to our installation, as follows:
   Evacuation of radioactive waste
  Quantity
  Decay bin (60 L)*
   0
  5 m3 pre-concreted crate (low- and intermediate-level waste)
  0
 5 m3 crate (low- and intermediate-level waste)
 3
 HDPE 200 L drums of ‘incinerable’ waste
  0
  HDPE 120 L drums of ‘incinerable’ waste
  0
 HDPE 120 L drums (laboratory waste)
  8
  30 L cylinders (liquid)
  1
 Radioactive liquid effluents from the reactor
  30.7 m3
    © C. Tresca
*The decay bins contain very active waste. They will be transferred to ANDRA’s new storage centre CIGEO as soon as it becomes available, after an interim period in special storage.
 Gaseous effluents
  Released in 2019 (TBq)
  Tritium
   5.8
  Rare gas
  0.76
 Carbon-14
  0.066
  Iodine
  0.00000069
 Aerosols
  0.00000017
    Liquid effluents
  Released in 2019 (TBq)
  Tritium
   0.053
  Carbon-14
  0.00013
 Iodine
  0.00000023
  Other activation products
   0.000047
   www.ill.eu


















































   105   106   107   108   109