Institut Laue-Langevin

With its international funding and expertise the Institut Laue-Langevin (ILL) offers scientists and industry the world's leading facility in neutron science and technology. From its Grenoble site in the south-east of France the Institute operates the most intense neutron source on earth.

Back to ILL Homepage
English French Deutsch 

Films and animations

Spherical panoramic views of the ILL

Outside views  |  Reactor level C Neutron guide hall 1  |  Neutron guide hall 2  |   Reactor level

June 2010: D19 , FIGARO , GRANIT , IN5 , PN3-GAMS5 , Neutron guides

Photographer: Laurent Thion (ecliptique.com)

Part 1 : Outside views

A view from the roof of ILL4





ILL4 roof
15 Nov 2006










Part 2 : Reactor experimental hall (level C)

2010

D19: from the instrument area

2 June 2010


GRANIT: from between the guide H18 and the UCN source

2 June 2010


PN3-GAMS5: from inside its housing


31 mai 2010






2009

D2B: from the instrument zone
July 2009


GRANIT: from the platform overhanging the instrument


July 2009


others soon to come!






2006

From the walkway around the experimental hall of the reactor


06 Avril 2006


BRISP: from its platform

BRISP-D3-D9
15 Nov 2006


D3, D9, BRISP: from the walkway

D3-D9-zone
15 Nov 2006






D3 and D9 zone

walkway-D3D9
15 Nov 2006


D4, IN1, PN1: from the top of PN1 beside D4 and IN1

PN1-D4IN1
16 Nov 2006


D15: from its platform

D15-IN8-D20
16 Nov 2006






IN4C: from the top of the instrument

H1H2-IN4c
15 Nov 2006


IN14 zone

IN14 zone
15 Nov 2006


IN14: from the walkway between IN14 and PN3-GAMS4

walkway-IN14-PN3
15 Nov 2006






IN20 zone

IN20-zone

15 Nov 2006


PN1: the RED magnet housing

PN1-red_magnet
(Thomas Materna, Norbert Laurens, Adeline Bail, Herbert Faust)
16 Nov 2006


PN3-GAMS4: from the top of its beam shielding

PN3-D4-IN14-BRISP
06 Avril 2006






PN3-GAMS5: from the top of the instrument

PN3-airlock-IN20

15 Nov 2006










 

To top

Part 3 : Neutron guide hall 1

From the top of guides 1 beside IN3


From the top of guide H23 between D1A and CT1


From the walkway facing SALSA

GuideHall1-IN3

16 Nov 2006


H23-D1A_CT1

16 Nov 2006


GuideHall1-SALSA

16 Nov 2006






From the walkway between IN11 and IN12


From the top of IN6


From the top of the beam shielding of IN5B

GuideHall1-IN11-IN12

16 Nov 2006


GuideHall1-IN6

16 Nov 2006


GuideHall1-IN5-D16

16 Nov 2006






From the sample zone of FIGARO





 


June 2010





 

To top

Part 4 : Neutron guide hall 2

From the top the guides between IN16 and D22


From the platform of ADAM


H53 end position: Cryo-EDM

GuideHall2-IN16-D22

16 Nov 2006


GuideHall2-ADAM-EDM

16 Nov 2006


Cryo-EDM _1

16 Nov 2006


H53 end position: Cryo-EDM





GuideHall2-Cryo_EDM 2

16 Nov 2006












 

To top

Part 5 : Reactor level D

After the refit

From the top platform of the cold source. (Restricted circulation, please ask the Reactor Division)


From the top platform of the maintenance post of the fuel element extractor coffin. (Restricted circulation, please ask the Reactor Division)


From the ladder to the crane. (Restricted circulation, please ask the Reactor Division)

ReactLevelD-4
15 Nov 2006


RectLevelD-3
15 Nov 2006


ReactLevelD-2
16 Nov 2006






From the platform of PF2. (Restricted circulation, please ask the Reactor Division)





ReactLevelD-1
16 Nov 2006











During the refit

From above the swiming pool. (Restricted circulation, please ask the Reactor Division)





React-LevelD-swimingpool
6 Avril 2005










 

To top

© 2007, Institut Laue-Langevin. Prepared by A.Filhol and Briq.