A view from the roof of ILL4 |
|
|
|
|  15 Nov 2006 |
|
|
|
|
|
|
|
|
|
2010 |
D19: from the instrument area  2 June 2010 |
| GRANIT: from between the guide H18 and the UCN source
2 June 2010 |
| PN3-GAMS5: from inside its housing

31 mai 2010 |
|
|
|
|
|
2009 |
D2B: from the instrument zone
July 2009 |
| GRANIT: from the platform overhanging the instrument

July 2009 |
| others soon to come! |
|
|
|
|
|
2006 From the walkway around the experimental hall of the reactor

06 Avril 2006 |
| BRISP: from its platform
15 Nov 2006 |
| D3, D9, BRISP: from the walkway

15 Nov 2006 |
|
|
|
|
| D3 and D9 zone 
15 Nov 2006 |
| D4, IN1, PN1: from the top of PN1 beside D4 and IN1 
16 Nov 2006 |
| |
D15: from its platform 
16 Nov 2006 |
|
|
|
|
|
| |
IN4C: from the top of the instrument

15 Nov 2006 |
|
| |
IN14 zone 
15 Nov 2006 |
|
| IN14: from the walkway between IN14 and PN3-GAMS4 
15 Nov 2006 |
|
|
|
|
| IN20 zone

15 Nov 2006 |
| PN1: the RED magnet housing  (Thomas Materna, Norbert Laurens, Adeline Bail, Herbert Faust)16 Nov 2006 |
| PN3-GAMS4: from the top of its beam shielding 
06 Avril 2006 |
|
|
|
|
| PN3-GAMS5: from the top of the instrument

15 Nov 2006 |
|
|
|
|
|
|
|
|
|
To top
From the top of guides 1 beside IN3 |
| From the top of guide H23 between D1A and CT1 |
| From the walkway facing SALSA | 
16 Nov 2006 |
| 
16 Nov 2006 |
| 
16 Nov 2006 |
|
|
|
|
| From the walkway between IN11 and IN12 |
| From the top of IN6 |
| From the top of the beam shielding of IN5B | 
16 Nov 2006 |
| 
16 Nov 2006 |
| 
16 Nov 2006 |
|
|
|
|
| From the sample zone of FIGARO
|
|
|
|
|

June 2010
|
|
|
|
|
To top
From the top the guides between IN16 and D22 |
| From the platform of ADAM |
| H53 end position: Cryo-EDM
| 
16 Nov 2006 |
| 
16 Nov 2006 |
| 
16 Nov 2006 |
| H53 end position: Cryo-EDM
|
|
|
|
|
16 Nov 2006 |
|
|
|
|
|
|
|
|
|
To top
After the refitFrom the top platform of the cold source. (Restricted circulation, please ask the Reactor Division) |
| From the top platform of the maintenance post of the fuel element extractor coffin. (Restricted circulation, please ask the Reactor Division) |
| From the ladder to the crane. (Restricted circulation, please ask the Reactor Division) |  15 Nov 2006 |
|  15 Nov 2006 |
|  16 Nov 2006 |
|
|
|
|
| From the platform of PF2. (Restricted circulation, please ask the Reactor Division) |
|
|
|
|  16 Nov 2006 |
|
|
|
|
|
|
|
|
|
During the refit From above the swiming pool. (Restricted circulation, please ask the Reactor Division) |
|
|
|
|  6 Avril 2005 |
|
|
|
|
|
|
|
|
|
To top
© 2007, Institut Laue-Langevin. Prepared by A.Filhol and Briq.
|